ABB

50 Years of Robotics: hacking the 3D Pipeline

Celebrate 50 years of robotics by

highlighting how robots have advanced

across various industries.

Using AI and Unreal Engine to optimize the process of production

We didn't just build a timeline — we designed a surreal "Robotics Museum". It’s a modern, rule-breaking 3D space highlighting robots as partners across different industries.

_environment
THE MUSEUM

a modern, rule-breaking 3D space blending historical archives with surreal perspectives

The Friction: We had to integrate decades of mismatched, low-quality archival media. Plus, traditional 3D rendering is a massive bottleneck, where a 3-minute video can take weeks to process. We needed to move faster and smarter.

_flexible
STORY

We tore down the standard pre-production model. Using ChatGPT, we distilled dense historical data into testable storylines, letting the client choose the narrative angle instantly

The Creative Tech Stack: We tore down the standard pre-production model and built a revised, tech-driven process

  • ChatGPT: Distilled dense history into testable storylines instantly, allowing us to pivot from a comical tone to a robot's perspective.

  • Midjourney: Replaced abstract concepts with precise, lit, and textured storyboards so the client could see the vision immediately.

  • ElevenLabs: Generated immediate voice-overs to lock in pacing and let the client select the narrative tone on day one.

  • Unreal Engine: The missing piece of the puzzle. Real-time rendering turned weeks of waiting into live art direction and instant client approvals.

_the
IMACT

Less friction, more craft. By fusing AI with real-time tech, we slashed 40% of the project timeline
— saving 2 to 3 weeks, and drastically reduced the final cost.

Less friction, more craft. By fusing AI with real-time tech, we slashed 40% of the project timeline — saving 2 to 3 weeks, and drastically reduced the final cost.

By fusing AI generation with real-time tech, we didn't just optimize the pipeline; we broke the speed limit. This new process slashed two to three weeks - about 40% of the total project time - drastically reducing final costs. Less friction, faster approvals, and pure focus on the craft.